Silage Tarp For Sale
Silage Tarp Introduction
Silage Tarp is also called Silage Cover, Black & White Film, Panda Film, Silage Sheet, Bunker Cover, or Silo Cover.
It is a kind of PE film made of LDPE, mLLDPE, and UV stabilizers. It provides a low-cost solution for feed storage, it is the ideal material to prevent crop spoilage.
The Guideline of Silage Tarp
What is Silage Tarp?
Silage Tarp is made from LDPE, mLLDPE, UV stabilizer, other auxiliary materials, etc.
It is used to cover the forage material and prevent spoilage at any season.
Specification of Silage Cover
Popular thickness: 5 mil, 6 mil, 8mil.
Standard width: 24 inch, 32 inch, 40 inch, 50 inch.
Standard length: 100 ft, 150 ft, 200 ft, 500 ft, 1150 ft, etc.
Tensile Strength: 25MPa. Elongation: >300%.
Why Use Silage Tarp?
- Made by LDPE & mLLDPE, with excellent tensile strength, and UV stability
- Guaranteed length and width, with waterproof sealed packaging
- Excellent UV stabilization, a minimum 12 months anti-UV warranty exposed to sunlight
- Less silage loss, less spoilage, less nutrient loss and increase aerobic stability
Attention when using the the Silage Cover
1. Choose the suitable thickness according to different crops, normally 5 mil is good enough
2. Black side is down and the White side is up to the sky
3. The surface should be immediately sealed with tape when there is a breakage
4. Used tires can be used placed on the silage tarp to prevent air enter the silage
Silage Tarp Prices Range For Sale
Container Prices (exchange rate 1:7): 5 Mil Silage Tarp
Prices are normally calculated as Square Feet and Square Meters.
5 mil: Fob China $0.17~$0.20/sq.ft
6 mil: Fob China $0.20~$0.25/sq.ft
8 mil Fob China $0.26~$0.30/sq.ft
Packaging & Loading of Silage Tarp
Skid/Pallet: plywood, plastic, metal, etc.
Packaging: 16 rolls or 20 rolls per skid/pallet
Loading: up to 30 skids/pallets per 1*40HQ, about 19.8 tons
Lead Time, Shipping Time, Arrival Time to the US & Canada
Container lead time: 25-30 days after deposit
Shipping time: 20-25 days to the western ports in the US & Canada. 35-40 days to the eastern ports in the US & Canada
Clearance at port: 3-7 days depending on different seasons, congestion & strike excluded
Inland transfer: 5-10 days depending on the distance from the port
Silage Cover Warranty
A minimum 12 months UV stability warranty
Longer timeframe can be achieved by adding more UV stabilizers
Silage Tarp Customized Solution
- Customized thickness: 5 mil, 6 mil, 8 mil, etc.
- Customized color: White and Black.
- Customized width: 24 inch, 32 inch, 40 inch, 50 inch, 60 inch, etc.
- Customized length: 100 ft, 150 ft, 200 ft, 500 ft, 11,500 ft, etc.
- Customized Packaging design by top-level designers.
FAQ
YES.
When silage is not tightly covered, air and moisture can easily enter the silo and adversely affect both the ensiling process and the quality of silage during storing and feeding
Leave it on the beds for minimum 2-3 weeks before removing them.
Imported mLLDPE, LDPE colorant, UV stabilizers, etc.
Normally, a minimum 12 months life is guaranteed.
Longer lifespan can be achieved by adding more UV stabilizers.
Production Technology: 7-layer is better than 5-layer, and better than 3-layer.
Ratio of UV Stabilizer: the more proportion of UV stabilizer, the longer life of silage tarp.
Thickness Difference: declared thickness may Not the real thickness.